[Oeva-list] Linn-Benton Community College installs ChargePoint EV Charging Stations

Jim Blaisdell blaze at chargenw.com
Tue Dec 29 08:54:31 PST 2009


The stations at Linn-Benton will start out with Level 1 only, then,  
as soon at the J1772 connectors are available, about March we will  
add the J1772 connectors. We are just waiting on the final  
certification of the J1772 standard.


Jim Blaisdell
Charge Northwest
Coulomb, Chargepoint Distributors
22322 NE 157th St
Woodinville, WA 98077

253-304-5625 	cell
253-265-0919	office
http://www.chargenw.com/
> P   Please consider the environment before printing this message.

On Dec 28, 2009, at 9:04 PM, patrick0101 at gmail.com wrote:

> Can you elaborate on "J1772 capability". Do these 3 stations have  
> J1772 connectors?
>
> Regards,
> Pat
> With Great Power, Comes Great Current and High Voltage   =D~
>
>
> On Mon, Dec 28, 2009 at 5:59 PM, Jim Blaisdell <blaze at chargenw.com>  
> wrote:
> Linn-Benton Community College just made life easier for Electric  
> Vehicle Drivers by installing 3, ChargePoint EV Charging Stations.  
> The networked stations will have both Level 1 and Level 2, J1772  
> Charging capability and each station is capable of charging  2  
> vehicles at the same.
>
> The exact location of the stations can be viewed on the map at:
> http://www.chargepointportal.net/index.php/device/devicelocation.html
>
> Jim Blaisdell
> Charge Northwest
> Coulomb, Chargepoint Distributors
> 22322 NE 157th St
> Woodinville, WA 98077
>
> 253-304-5625 	cell
> 253-265-0919	office
> http://www.chargenw.com/
>> P   Please consider the environment before printing this message.
>
>
> _______________________________________________
> Oeva-list mailing list
> Oeva-list at oeva.org
> http://www.rdrop.com/mailman/listinfo/oeva-list
>
>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: /pipermail/attachments/20091229/1c3d6ae3/attachment.html 


More information about the Oeva-list mailing list