[Oeva-list] World Trade Center EVSE Changes

matwete@comcast.net matwete at comcast.net
Tue Dec 27 08:56:26 PST 2011


Thanks for the bigger picture clarification...timing is very bad for me though...I can no longer charge at Intel due to J1772 plugs exclusively and downtown is no longer within charge range for me since moving the car to Hillsboro---www.evalbum.com/348 .  Oh well...

From my Android phone on T-Mobile. The first nationwide 4G network.

----- Reply message -----
From: "Kevin Fairham-Wheeler" <Kevin.Fairham-Wheeler at pgn.com>
To: "Myles Twete" <matwete at comcast.net>, "'OEVA List'" <oeva-list at oeva.org>
Subject: [Oeva-list] World Trade Center EVSE Changes
Date: Tue, Dec 27, 2011 8:04 am


Good morning Miles and all.

Miles is right. It is interesting but there is no connection other than Intel and PGE are upgrading to Level II charging at about the same time and the Level I now at the World Trade Center was one of the units that was out at Jones Farm. By the way the two chargers replacing the Shorepower units are Coulombs.

The Level I & II charger formerly at the World Trade Center will be retrofitted to add a second Level II charger. As advised it will be reinstalled and active with two Level II chargers by 1/14/12.

Hope everybody had a great holiday,

Kevin


Kevin Fairham-Wheeler

Transportation Electrification
Portland General Electric


From: oeva-list-bounces at oeva.org [mailto:oeva-list-bounces at oeva.org] On Behalf Of Myles Twete
Sent: Saturday, December 24, 2011 11:02 AM
To: 'OEVA List'
Subject: Re: [Oeva-list] World Trade Center EVSE Changes

Interesting that this is happening right on the heels of Intel's 2 Shorepower units suddenly being swapped out for Blink Level 2 chargers...probably no connection between the two stories.

From: oeva-list-bounces at oeva.org [mailto:oeva-list-bounces at oeva.org] On Behalf Of Barbara Ballew
Sent: Thursday, December 22, 2011 8:07 PM
To: kevin.fairham-wheeler at pgn.com; OEVA List
Subject: Re: [Oeva-list] World Trade Center EVSE Changes

Do you mean there will be no Level 1 charging on the street at 1st and Salmon after 1/14?
(just to clarify for those of us driving Level 1 vehicles, and Leaf owners who make use of trickle charging)

Barbara Ballew
baballew at msn.com<mailto:baballew at msn.com>


________________________________
From: Kevin.Fairham-Wheeler at pgn.com
To: oeva-list at oeva.org
Date: Thu, 22 Dec 2011 16:19:12 -0800
Subject: [Oeva-list] World Trade Center EVSE Changes
The PGE's ShorePower charging station at 1st and Salmon in downtown Portland will be under construction starting as early as 12/22/11. There will be Level I charging available during the construction period but the Level II unit will be shut down. All will be replaced by two Level II charging stations by 1/14/12.

We apologize for any inconvenience this will cause. Level I, Level II and DC Quick Charging is and will remain available in the World Trade Center garage. That entry is on Taylor between 1st and 2nd off Naito Parkway.

Thank you for your patience,

Kevin


Kevin Fairham-Wheeler
Transportation Electrification
Portland General Electric


_______________________________________________ Oeva-list mailing list Oeva-list at oeva.org<mailto:Oeva-list at oeva.org> http://www.rdrop.com/mailman/listinfo/oeva-list

-------------- next part --------------
An HTML attachment was scrubbed...
URL: /pipermail/attachments/20111227/c68b6384/attachment-0001.html 


More information about the Oeva-list mailing list