[Oeva-list] World Trade Center EVSE Changes

matwete@comcast.net matwete at comcast.net
Tue Dec 27 12:08:41 PST 2011


I want to use a standard 3-prong 110v plug...it's not an option on these chargers.

From my Android phone on T-Mobile. The first nationwide 4G network.

----- Reply message -----
From: "Scott Hippe" <scott.hippe at me.com>
To: <oeva-list at oeva.org>
Subject: [Oeva-list] World Trade Center EVSE Changes
Date: Tue, Dec 27, 2011 10:47 am



Some models of the Coulomb level 2 stations also provide level 1.  Are we sure this is not the case here?



On Dec 27, 2011, at 10:35 AM, matwete at comcast.net wrote:

> Again,thanks for the big picture...still too bad they couldn't't throw a 110v bone to those of us w/o J1772 connections and leave us one of the shorepower units...
> 
> From my Android phone on T-Mobile. The first nationwide 4G network.
> 
> ----- Reply message -----
> From: "Alan Bates" <abates at shorepower.com>
> To: "Kevin Fairham-Wheeler" <Kevin.Fairham-Wheeler at pgn.com>, "Myles Twete" <matwete at comcast.net>, "'OEVA List'" <oeva-list at oeva.org>
> Subject: [Oeva-list] World Trade Center EVSE Changes
> Date: Tue, Dec 27, 2011 9:28 am
> 
> 
> It is our understanding that the reason the swap was made was that Intel has signed national agreements with Coulomb to outfit many of their facilities with Coulomb EVSE.
> 
> The Coulomb ChargePoint network received $30 million in DOE ARRA stimulus funds along with millions more in private equity.
> 
> Alan Bates
> Vice President of Marketing
> Shorepower Technologies
> 2351 NW York Street
> Portland, OR 97210
> O (503) 892-7345 M (503) 810-7396 Skype: shorepowertechnologies
> abates at shorepower.com<mailto:abates at shorepower.com>
> Recent news: http://www.shorepower.com/blog1
> [cid:image001.jpg at 01CCC479.1B7AA090]
> [cid:image003.jpg at 01CCC479.F60EBE30]
> 
> From: oeva-list-bounces at oeva.org [mailto:oeva-list-bounces at oeva.org] On Behalf Of Kevin Fairham-Wheeler
> Sent: Tuesday, December 27, 2011 8:04 AM
> To: Myles Twete; 'OEVA List'
> Subject: Re: [Oeva-list] World Trade Center EVSE Changes
> 
> Good morning Miles and all.
> 
> Miles is right. It is interesting but there is no connection other than Intel and PGE are upgrading to Level II charging at about the same time and the Level I now at the World Trade Center was one of the units that was out at Jones Farm. By the way the two chargers replacing the Shorepower units are Coulombs.
> 
> The Level I & II charger formerly at the World Trade Center will be retrofitted to add a second Level II charger. As advised it will be reinstalled and active with two Level II chargers by 1/14/12.
> 
> Hope everybody had a great holiday,
> 
> Kevin
> 
> 
> Kevin Fairham-Wheeler
> 
> Transportation Electrification
> Portland General Electric
> 
> 
> From: oeva-list-bounces at oeva.org<mailto:oeva-list-bounces at oeva.org> [mailto:oeva-list-bounces at oeva.org]<mailto:[mailto:oeva-list-bounces at oeva.org]> On Behalf Of Myles Twete
> Sent: Saturday, December 24, 2011 11:02 AM
> To: 'OEVA List'
> Subject: Re: [Oeva-list] World Trade Center EVSE Changes
> 
> Interesting that this is happening right on the heels of Intel's 2 Shorepower units suddenly being swapped out for Blink Level 2 chargers...probably no connection between the two stories.
> 
> From: oeva-list-bounces at oeva.org<mailto:oeva-list-bounces at oeva.org> [mailto:oeva-list-bounces at oeva.org]<mailto:[mailto:oeva-list-bounces at oeva.org]> On Behalf Of Barbara Ballew
> Sent: Thursday, December 22, 2011 8:07 PM
> To: kevin.fairham-wheeler at pgn.com<mailto:kevin.fairham-wheeler at pgn.com>; OEVA List
> Subject: Re: [Oeva-list] World Trade Center EVSE Changes
> 